
A high proportion of the projects we undertake involve both demolition and strip out works in preparation for refurbishments.
Typically, our most requested service consists of removal of all fixtures and fittings (including mechanical and engineering and sanitary ware), removal of asbestos or asbestos containing materials, ceilings, partitions etc. to leave an empty expanse for redevelopment. We frequently include the demolition of internal walls and structural alterations and/or the retention of some elements or services.
Our working methods and professional conduct ensures we leave sites satisfactorily prepared to support the successful completion of the continuing project.
An important part of all works, but perhaps more so for this type of work, is our commitment to recycling of the waste produced.
You can read more about our commitment to recycling here.
One of the ways in which we find we can add value to our services, is with our ability to provide metal fabrication services.
There is often a need to remove a Demolition/Strip Out contractor from site to allow for steelworks to be undertaken by a separate contractor before the demolition or strip out can then continue.
By being able to provide this service we can reduce delays and costs to the overall project.
With a dedicated workshop and engineers this is, we believe, a unique added benefit.
Liverpool School of Tropical Medicine
Bollin Primary School, Altrincham
Goldsmiths